Temporary construction fence setup is a simple process, which can easily be accomplished by one person. Only a rachet or pliers are needed to complete the installation with these four simple steps.
1. Setup the base plates approximates 7.5 feet apart.
2. Slide the panels onto the bases.
3. Secure the tops of the fence panels with the panel clamp.
4. Install optional "No-Climb" extension panels to the top using the connectors.